Leveling of loaded waste | no |
Waste bags opening | manual |
Fine fraction (up to 70 mm) separation | no |
Selection of useful fraction | manual |
Ferrous metals selection | no |
Perforation of PET-bottles before pressing | no |
Number of paired posts of manual selection | 5 |
Loading of recyclables for pressing | manual |
Waste is being transported by garbage trucks and unloaded on unloading area. Waste loading on loading chain conveyor is performed by front-end loader. Sorters, which stay at the opposite sides from loading conveyor, are select lists of cardboard, boxes, packing tape and other large objects. From loading conveyor waste is being transported on sorting belt conveyor.
Selected useful fractions are being dropped in special movable containers by sorters. These containers are placed between sorting conveyor platform supports. Filled containers are being moved to recyclables pressing area. Loading of recyclables into vertical press is manual.
Waste, that remains after useful fractions selecting are being transported into open containers or compactors.