Submit your application
* required fields
YouTube
VK
/
/
/
Waste sorting facility with productivity up to 30 thousand tons of MSW per year (variant)

Waste sorting facility with productivity up to 30 thousand tons of MSW per year (variant)

The facility consists of one waste sorting line with productivity up to 10 tons per hour. With one working shift, productivity of the facility is up to 30 000 tons per year.
Get a commercial offer
Submit your application
* required fields
Basic parameters
Leveling of loaded waste no
Waste bags opening manual
Fine fraction (up to 70 mm) separation no
Selection of useful fraction manual
Ferrous metals selection no
Perforation of PET-bottles before pressing no
Number of paired posts of manual selection 5
Loading of recyclables for pressing manual
Sample recording when ordering:

Waste is being transported by garbage trucks and unloaded on unloading area. Waste loading on loading chain conveyor is performed by front-end loader. Sorters, which stay at the opposite sides from loading conveyor, are select lists of cardboard, boxes, packing tape and other large objects. From loading conveyor waste is being transported on sorting belt conveyor.

Selected useful fractions are being dropped in special movable containers by sorters. These containers are placed between sorting conveyor platform supports. Filled containers are being moved to recyclables pressing area. Loading of recyclables into vertical press is manual.

Waste, that remains after useful fractions selecting are being transported into open containers or compactors.
Waste sorting facility with productivity up to 30 thousand tons of MSW per year (variant) - схема 1
upstairs